Iranian Central Oilfields Company
Project type: EPC
Complete implementation of two metro stations as EPC in Hashtgerd, which includes design review, engineering the switch yard construction works and necessary calculations based on technical specifications, preparation of technical documents and instructions for installation, testing and commissioning, as well as supply of required materials and equipment, procurement of necessities , manufacturing, testing in the manufacturer's factory, performing functional tests, packaging for export, abroad transportation (sea, land or air), obtaining the entry permit for importing goods and clearance and performing customs duties, loading, and unloading, transportation and insurance for inland transportation of materials and equipment from the contractor's workshop to the site, site equipment, storage and storeroom, moving equipment and materials in the site (transportation from the warehouse to the installation site), running and setting up the technical office, necessary protection, workshop assembly, installation and preparation of surface, painting, insulation, workshop tests, performing pre-commissioning operations, monitoring and commissioning, correcting defective or incomplete works, project management as well as provisional acceptance, fixing defects in warranty periods and trial operation, final acceptance, supply of spare parts for 5 years, providing and delivery of drawings and technical documents.
Start | End :
2020 | 2021